At present, the shiprepairing and ship conversion got the victory news. On the afternoon of 2nd August, the conversion vessel “Spartan Warrior” from single-hull to double-hull made sailing successfully.
The shiprepairing production has been at the peak period since entering the third quarter. Now the quantity of shiprepair and ship conversion vessels in our shipyard is about 18 and the docking plan has already arranged in the middle of September. According to statistics, the steel quality of reparing and forthcoming vessels is more than 3000 tons, the tank coating area is about 60,000 m2 and the blasting and coating area of cargo holds is more than 150,000 m2, the production task is very plentiful.